PROTECTED STRUCTURE.: The development will consist of Amendments to previous approved permission Ref. 3627/24, including the following modifications: 1) A change of use from office to multi-unit residential use. Reconfiguration of layouts at basement, ground floor, and first floor levels, and revised arrangement of the fire escape stair and exit locations etc. 2)Amendments to the upper floor units (second and third floors): the previously approved 4-bedroom duplex unit is replaced with two 1 bedroom apartments and one studio apartment, in accordance with the Planning Design Standards for Apartments Guidelines for Planning Authorities, 2025.
64 Leeson Street Lower, Dublin 2, D02YY59
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also fire safety in Dublin
Industrial building extension with fire escape and elevation alterations.
SD25A/0206W · 30 Jun 2026
Hostel to community offices conversion with internal refurbishment.
WEB1681/26 · 26 Jun 2026
Air conditioning installation and minor structural alterations with fire precautions.
WEB1109/26 · 24 Jun 2026
Strategic housing development for student accommodation.
ABP31141121/E · 22 Jun 2026
Distribution warehouse high-level extension with docking bays and fire exit.
WEB2489/26 · 16 Jun 2026
Protected structure rear extension, lift installation, fire safety.
WEB2499/26 · 16 Jun 2026