PROTECTED STRUCTURE: The refurbishment of the existing restaurant premises comprising: 1) the removal of existing internal fit out works (bar area, floor finishes, wall linings, ventilation, air conditioning condensers, loose tables and fixtures, kitchen equipment, lighting, sanitary ware and electrical cables) and a mezzanine structure; 2) the fit out of the interior of the premises including new wall linings, new heating, ventilation and air conditioning ductwork and kitchen extract (using existing openings), replacement air conditioning cassettes with external condensers located within lightwell, new floor finishes, demountable partition walls and ceiling to create larger kitchen area and customer service counter, new commercial kitchen, new track and feature lighting, fire alarm system and small power and data cabling, acoustic ceiling rafts suspended from the ceiling, internal raised stepped seating area along the rear (Prices Lane) wall, banquette seating and seating booths, free-standing drink station and recycling bins, internal signage, digital displays, and digital artwork wallpaper, redecoration of previously decorated walls and exposed ceilings and structure, and new sanitary ware and wall/floor tiles to toilets in basement; 3) the repair and refurbishment of the existing Westmoreland Street shopfront; and 4) the installation of an internally illuminated sign inside the shopfront window, a projecting sign on the Westmoreland Street elevation and the replacement of individual cut letters (sign) on the shopfront
11-12 Westmoreland Street, Dublin 2, D02 XE29
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also fit-out in Dublin
Dormer attic extension with cladding and internal alterations.
SD26B/0174W · 09 Jul 2026
Change of use of the existing Unit 14b (996sq.m) to use as a gym including internal layout modifications, external signage and all associated site and development works.
SD26A/0089W · 07 Jul 2026
New internally illuminated shopfront installation.
D26A/0260/WEB · 02 Jul 2026
Internal reconfiguration and fit-out works.
D26A/0356/WEB · 02 Jul 2026
Change of use to 34-room hotel within existing building with internal reconfiguration.
WEB1772/26 · 01 Jul 2026
Change of use from residential to embassy office at protected structure.
WEB2624/26 · 01 Jul 2026