PERMISSION and RETENTION: Retention permission for (i) the change of use of the site from ‘restaurant car park’ use to ‘sports facility and recreational’ use; (ii) removal of a 0.75m high boundary wall; (iii) installation of 5 no. sauna units and 3 no. plunge pools; (iv) installation of male and female changing rooms, office, and WC; (v) exterior signage; and PLANNING permission for (vi) provision of a new pedestrian crossing and associated road markings; (vii) provision of a 1.5m wide footpath along the site accessway; (viii) provision of covered bicycle parking comprising 10 no. bicycle parking spaces; (ix) reallocation of 4 no. existing car parking spaces for the proposed development; and (x) all associated site works, including public lighting to facilitate the development. Permission is also sought for (xi) the omission of Condition 4(a) as attached to Reg. Ref. 2555/18.
The Hot Box Sauna, Unit 5, Goldenbridge Industrial Estate, Tyrconnell Road, Dublin 8
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also plumbing in Dublin
Garden room with home office replacing removed shed, larger footprint.
SD26B/0262W · 09 Jul 2026
Ground floor extension with study, bedroom and ensuite.
ED26/0064 · 08 Jul 2026
Two-storey semi-detached dwelling 91m2 with ancillary works.
SD21A/0074/EP · 06 Jul 2026
The development will consist of attic conversion to include new rear f
FW26A/0192E · 06 Jul 2026
Single dwelling construction.
V/043/26 · 06 Jul 2026
The proposed development will consist of (i) the construction of 32 no
F25A/0845E · 06 Jul 2026