(i) the demolition of an existing steel fire escape staircase attached to the exterior of the building at the northern gable end; (ii) the construction of a new external steel fire escape staircase attached to the northern side of the existing building which will serve the three upper stories, ie first second and third floors, as well as the roof of the existing building. The new stairs is to be roofed but not fully enclosed on the sides; (iii) the widening of three no. existing external door opes opening onto the stairs, one at each of first floor, second floor and third floor levels; (iv) the replacement of an existing full height metal access gate with protective cage at roof level with a new mesh metal access gate in the same location, height to match the existing railing; and (v) all associated siteworks, services and landscaping to facilitate the proposed development.
Bunscoil Sancta Maria, Synge Street, Dublin 8
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also steel in Dublin
New 739m² industrial steel portal frame building with insulation.
SD26A/0084W · 08 Jul 2026
Two three-storey detached houses with parking, walls and drainage.
F26A/0370E · 03 Jul 2026
Three-storey over basement residential apartment block development.
D26A/0360/WEB · 03 Jul 2026
Replacement of rusty steel post with block support structure.
D26B/0283 · 01 Jul 2026
New canopy and associated structural works installation.
D26B/0189/WEB · 01 Jul 2026
Large-scale residential development: 569 units on protected structure site.
WEBLRD9008/26-S3 · 30 Jun 2026