(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
Camac House,1-3 Bow Bridge, Dublin 8
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also fit-out in Dublin
Dormer attic extension with cladding and internal alterations.
SD26B/0174W · 09 Jul 2026
Change of use of the existing Unit 14b (996sq.m) to use as a gym including internal layout modifications, external signage and all associated site and development works.
SD26A/0089W · 07 Jul 2026
New internally illuminated shopfront installation.
D26A/0260/WEB · 02 Jul 2026
Internal reconfiguration and fit-out works.
D26A/0356/WEB · 02 Jul 2026
Change of use to 34-room hotel within existing building with internal reconfiguration.
WEB1772/26 · 01 Jul 2026
Change of use from residential to embassy office at protected structure.
WEB2624/26 · 01 Jul 2026