The development will consist of the material change of use from office/storage to a unit for day services use, to enable the provision of services to people with intellectual disabilities. The removal of the existing mezzanine floor and the removal of the existing roller shutter unit and installation of new windows to the front and rear elevation, (d) the widening of the existing doors to the front and rear elevation. Removal and infilling of existing windows at high level to the front and rear elevation with the installation of manifestation signage to the front window and (g) all associated site works.
Unit 8, Hills Industrial Estate, Lucan, Co. Dublin
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Stewarts Care DAC
Also glazing in Dublin
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
SD26B/0166W · 09 Jul 2026
Garage conversion to playroom with glazed window and elevational treatment changes.
SD26B/0257W · 09 Jul 2026
Attic conversion with roof modification, windows and dormer.
SD26B/0161W · 09 Jul 2026
Attic conversion with gable raising, dormers and velux windows.
SD26B/0037 · 08 Jul 2026
Single detached dormer dwelling with 15 sqm ground floor space.
D26A/0367/WEB · 08 Jul 2026
The proposed development will consist of (i) the construction of 32 no. houses comprising 2 no. detached 4 bed single-storey houses, 6 no. semi-detached 2 bed single-storey houses, 4 no. detached 3 bed two-storey houses, 12 no. semi-detached 3 bed two-storey houses and 8 no. detached 4 bed two-storey houses, (ii) provision of a temporary wastewater treatment plant to be connected to existing foul sewer pumping station, (iii) provision of public open spaces and landscaping, (iv) site services and (v) all associated site works. A Natura Impact Statement (NIS) has been prepared for the proposed development. Additional Information Received 12/05/2026
F25A/0845E · 06 Jul 2026