The retention of development consists of the construction of a timber deck and timber guardrail at second floor level, built on top of an existing flat roof to the rear, (which serves the residential accommodation beneath), all providing a balcony / terrace to the existing residential unit. Retention is also sought for the replacement of a second floor window with a new door to access the new balcony area and permission to erect a 1.6M high screen at the perimeter of the new balcony to prevent overlooking of adjacent properties.
4, Olivemount Terrace, Windy Arbour, Dublin, D14E067
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also timber frame in Dublin
Garden room with home office replacing removed shed, larger footprint.
SD26B/0262W · 09 Jul 2026
Two storey dwelling modifications, floor area reduction, roof and layout changes.
SD26B/0195W · 09 Jul 2026
Garage conversion with pitched roof, porch and entrance widening.
SD26B/0265W · 09 Jul 2026
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
SD26B/0166W · 09 Jul 2026
Attic storage conversion with dormer, rooflights and gable works.
SD26B/0180W · 09 Jul 2026
Gable wall raising with rear dormer and new bedroom.
SD26B/0181W · 09 Jul 2026