The development at Carrig Baun (Protected Structure ref 1501) will consist / consists of the following amendment to the previously approved scheme (Planning Register Reference D24A/0727): (i) The introduction of a new ensuite bathroom at first floor (entrance) level, located within the room previously identified as a study; (ii) All interventions are designed to be fully reversible and sympathetic to the character and architectural significance of the Protected Structure; (iii) All other works remain as previously permitted under Planning Permission Ref. D24A/0727.
Carrig Baun, Rockfort Avenue, Dalkey, Dublin, A96YW35 (Protected Structure)
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also bathrooms in Dublin
Retention planning application for alterations internally and externally to the existing dwelling consisting of (1) re-location of front door to the side and installation of a bathroom window to the front (2) conversion of the existing garage and construction of a single storey flat roof extension to the rear and (3) garden recreation and storage room to the rear with ancillary site services and landscaping to the rear
D26B/0290/WEB · 08 Jul 2026
Change of use to 34-room hotel within existing building with internal reconfiguration.
WEB1772/26 · 01 Jul 2026
Attic conversion with extended dormer for bedroom and bathroom.
WEB2109/26 · 30 Jun 2026
Care residence extension with accessible facilities and alterations.
SD26A/0044W · 30 Jun 2026
Bathroom, home office and hot press addition to first floor.
D26B/0270 · 29 Jun 2026
Rear single and two-storey extensions for kitchen, bedroom, bathroom.
WEB2079/26 · 29 Jun 2026