Electricity Supply Board (ESB) intends to apply for Permission for development at a 10.22 hectare site within ESB Aghada Generating Station. The Proposed Development includes amendments to the development described in the planning application granted planning permission (Planning Reference No. 23/5104) dated the 7th of December 2023 by Cork County Council (CCC). The proposed amendments are: i. An air insulated switchgear (AIS) compound to replace the previously approved gas insulated switchgear (GIS) building (in same location and similar in area), ii. A new 49m² control room (3.6 m high) within the AIS compound, iii. Reconfiguration of the approved rainwater drainage system, iv. A new underground firewater retention basin (approx. dimensions: 280m2 / 700m3). The development consists of an activity for which an Industrial Emissions Licence is required. ESB Aghada Generating Station is a registered lower tier establishment under the Control of Major Accident Hazard (COMAH) Regulations, 2015. The development will consist of the provision of, or amendments to, an establishment within the meaning of Part 11 of the Planning and Development Regulations (Major Accidents Directive). An Environmental Impact Assessment Report (EIAR) complying with the European Union (Planning and Development) (Environmental Assessment) Regulations 2018 (S.I. 296 of 2018) and a Natura Impact Statement (NIS) were submitted to the Planning Authority with the previously approved application. An Environmental Effects Compliance Report and Ecology Technical Note accompany this application confirming no changes to the previous conclusions.
ESB Aghada Generating Station, Townlands of Ballincarroonig and Aghada, Aghada, Co. Cork, P25 XE94
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Electricity Supply Board (ESB) Ireland
Also electrical in Cork
Retention of single storey extension to dwelling.
26/1848 · 09 Jul 2026
Works to existing two-storey detached dwelling.
26/1851 · 09 Jul 2026
New dwelling house construction.
26/1850 · 09 Jul 2026
Drive-thru coffee unit in converted building.
26/1847 · 09 Jul 2026
Three detached dwellings with domestic garages and associated works.
26/1836 · 08 Jul 2026
Two tennis courts with floodlight installation.
26/1837 · 08 Jul 2026