The construction of a two-megawatt ballast-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of grassland to the east of the main building on site. The array will have a maximum height of three metres above existing ground level, at the townland of Barnagore, Ovens, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Barnagore, Ovens, County Cork, P31 D253
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also solar pv in Cork
Madigan's Solar Farm construction and installation.
26/1755 · 29 Jun 2026
Solar farm development by Amarenco Solar Inniscarra Limited.
26/1721 · 25 Jun 2026
Dwelling with solar PV system and wastewater treatment
26/1104 · 21 Jun 2026
10-year solar farm permission on 13.6 hectare site.
26/1641 · 18 Jun 2026
Installation of 661.4m2 roof-mounted solar photovoltaic system.
26/44649 · 14 Jun 2026
Installation of 2674m2 roof-mounted solar photovoltaic system.
26/44648 · 14 Jun 2026