appliedIndustrial·Cork County Council
A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with sections 34D(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Gortnagross, Mallow, Co. Cork
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
AMARENCO SOLAR MALLOW LIMITED
CRO 571074- Company type
- LTD - Private Company Limited by Shares
- Incorporated
- 2015-11-03
- Registered address
- 11 ANGLESEA STREET, CO. CORK,CORK, CO. CORK, CORK, IRELAND
Also solar pv in Cork
Madigan's Solar Farm construction and installation.
26/1755 · 29 Jun 2026
Solar farm development by Amarenco Solar Inniscarra Limited.
26/1721 · 25 Jun 2026
Dwelling with solar PV system and wastewater treatment
26/1104 · 21 Jun 2026
10-year solar farm permission on 13.6 hectare site.
26/1641 · 18 Jun 2026
Installation of 661.4m2 roof-mounted solar photovoltaic system.
26/44649 · 14 Jun 2026
Installation of 2674m2 roof-mounted solar photovoltaic system.
26/44648 · 14 Jun 2026