appliedPublic / civic·Cork County Council

Permission for the provision of new club facilities comprising, 1) The construction of 1 no. full sized playing pitch including ground works to alter levels of the existing agricultural field, the erection of goal posts, floodlighting on 6 no. x 21.0m high poles, 12.0m high ball stop netting with support posts, 1.2m high perimeter fencing to playing pitch, a 2.45m high security fence to boundary with adjacent residential site to the north, 2) A single storey clubhouse building comprising changing rooms, showers, public toilets and an equipment store, 3) A surface level car park comprising 64 no. car parking spaces and facilities for bicycle parking, 4) Alteration and extension of existing gravelled pedestrian walkways, 5) Construction of 3.6m wide gravelled vehicular access road, separated by 1.2m high fence from the pedestrian walkway where both have the same alignment, 6) A covered, tiered spectator stand with a 200 seat capacity, 7) A permeable grass paving area not exceeding 2800m2 for car parking, located inside the existing eastern entrance from the L-1529-0 local public road, 8) Alteration of the existing eastern entrance to safely facilitate both vehicular and pedestrian traffic, 9) An on-site wastewater treatment and disposal system, 10) All associated site development work including walkway lighting, drainage and signage.

Ballynoe, Cork, P51H275

Street view of the planning site
Satellite view at 52.05755, -8.10144

Satellite · Zoom 19

Trades in scope

Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.

Applicant

Private applicantIndividual

Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.